all both out:
- Author the CI workflow file (e.g.
.github/workflows/*.yml,.gitlab-ci.yml, Azure Pipelines) that runs the gate. An agent can do this. - Make that workflow an enforced gate — a required status check / branch-protection rule / merge-request approval rule. This is a manual platform-UI / admin step (GitHub → Settings → Branches; GitLab protected branches + MR settings; etc.) that an agent cannot perform. Until a human configures it, CI runs on PRs but does not block merges.
Because step 2 is outside the agent's reach, every plan that stands up CI must emit it as an explicit user action item (in the phase's exit criteria and in §9 Open questions / decisions needed from stakeholders), so the reader knows the gate is not self-enforcing until they turn it on.
Output of Phase 2: for each component — the spike result, the chosen strategy (A or B), the located Testability Milestone, the pre/post label, and the target safety-ladder rung with any residual risk named — plus the plan-wide CI Milestone (which phase stands up CI) and the reminder that enforcing it is a manual human step. Everything downstream depends on these.
Phase 2.5: Red-team every phase against the hazard catalog (mandatory)
The strategic scaffolding above (testability, safety ladder, CI milestone) is
necessary but not sufficient. Modernization plans also fail on tactical,
ecosystem-predictable hazards — an incomplete quarantine set, a forgotten
namespace codemod, a runtime bump that leaves the base images behind, a stateful
data-store major treated as an image bump, an edge rewrite that drops the
anonymous route class. These are so recurring that they have their own catalog:
references/migration-hazards.md (H1–H8).
Rule: before any phase is implemented, red-team its plan against every hazard
in references/migration-hazards.md. For each hazard, ask "does this phase
trigger it?", run the hazard's detection probe against the real repo, and fold
its plan action into the phase's tasks/exit criteria before writing code. A
hazard caught in planning is a task; caught in review it's rework; caught in prod
it's an incident. Record hazards you checked and cleared, not just the ones
that fired — a silent skip is indistinguishable from a miss.
This is the institutionalized form of an independent-critic pass. Do it yourself by walking the catalog, and — where an independent second opinion is available (e.g. a rubber-duck / critique agent) — use it: on the reference PiggyMetrics run such a pass caught a blocking plan gap in every single phase, and each gap was an instance of an H1–H8 class. Bake the outcome into each phase's "Decisions made" and exit criteria so the executing agent inherits the cleared checklist rather than re-discovering the hazard.
Phase 3: Recommend Target Architecture
Decision framework — always evaluate in this order:
For each component/dependency, work through these levels from least-disruptive to most-disruptive. Stop at the first level that solves the problem:
-
Upgrade in place — Can you bump the major version and fix breakages? (e.g., Node 14→22, Python 2→3, React 16→19, Rails 5→7). This is the default answer. Only reject it if the upgrade path is officially unsupported, the breaking changes are so extensive they exceed rewrite cost, or the framework itself is abandoned/EOL.
-
Swap the dependency — If the specific library is dead but the pattern is fine, can you swap to a maintained alternative with the same interface shape? (e.g., Moment.js → date-fns, Request → got/fetch, CoffeeScript → TypeScript with decaffeinate). Prefer drop-in or mechanical migration tools when they exist.
-
Wrap/adapt (Strangler Fig) — If the component's interface is sound but internals are unmaintainable, can you put a clean interface in front and incrementally replace internals behind it? This works when coupling is manageable and the system can run with old and new coexisting.
-
Rewrite — Only when: the framework is abandoned with no upgrade path, the architecture fundamentally cannot support required new capabilities (e.g., synchronous-only design that must become real-time), or honest estimation shows upgrade cost exceeds rewrite cost. Require explicit justification for every rewrite recommendation — "it's old" is not sufficient.
-
Remove — Dead code, features with zero usage, deprecated capabilities superseded by other systems. Verify usage claims before recommending removal.
Bias toward conservatism. The cheapest migration is the one you don't do. Every level of disruption adds risk, timeline, and cost. A working system on an older framework is better than a half-finished rewrite on a new one.
Mechanical-migration riders (apply whenever a recommendation is an upgrade,
swap, or removal). These are the parts of a target-architecture decision that
first-draft plans routinely drop; each maps to a hazard class in
references/migration-hazards.md:
- Transitive-quarantine completeness (H1). When removing/cutting over a whole dependency family, grep the dead artifact across all manifests and list the full set of dependents that must move or be quarantined — not the subset you first thought of. State the post-cutover build target explicitly.
- Framework-major codemods (H2). A major bump carries mechanical breaking
changes independent of your logic — namespace renames, removed deprecated APIs,
a changed test engine, changed config keys. Enumerate each as its own task
and prefer the ecosystem's automated recipe/codemod tool (OpenRewrite,
jscodeshift/react-codemod,
2to3/pyupgrade, etc.) over hand-editing on large trees. Don't forget the test-framework migration — it is the most-forgotten one. - Runtime↔deployment lockstep (H3). If a recommendation bumps the
language/runtime major, every place the runtime is pinned for running the
app — base images,
docker-composebuild contexts, CI runner images,engines/.nvmrc/.tool-versions, serverless runtimes — must move in the same phase. Build-runtime and run-runtime must never drift across a phase boundary, or the app builds green and then fails to run.
Produce a Target Architecture section that includes:
- Recommended tech stack with rationale for each choice (framework, language, runtime, database, infrastructure)
- Architectural pattern recommendation (monolith → modular monolith → services, event-driven, serverless, etc.) with justification
- What stays vs. what goes — explicitly categorize each major component using
the decision framework above:
- ✅ Keep as-is (still modern/adequate)
- ⬆️ Upgrade in place (bump version, fix breakages)
- 🔀 Swap dependency (replace dead library with maintained equivalent)
- 🔄 Wrap/adapt (add an interface layer, incrementally replace internals)
- 🔁 Rewrite (fundamentally incompatible — justification required)
- 🗑️ Remove (dead code, deprecated features, superseded)
For each recommendation, write an inline ADR:
#### ADR: [Decision Title]
- **Context:** [Why this decision is needed]
- **Decision:** [What we chose and which decision framework level it falls under]
- **Alternatives considered:** [What else was evaluated and why it lost]
- **Consequences:** [Tradeoffs accepted]
Phase 4: Per-Feature Migration Analysis
For each major feature/domain identified in the architecture doc, produce a section covering:
- Current implementation — one paragraph summary with file references
- Migration strategy — the A/B choice from Phase 2 for this component (Freeze-then-lift vs. Beachhead/walking-skeleton), plus the tactic: Strangler Fig, Big Bang rewrite, Lift & Shift, Incremental Refactor, or Leave In Place
- Testability status — where this component's Testability Milestone lands, and its safety-ladder rung (L0–L4) with residual risk named
- Dependencies and coupling — what else breaks or must move with it
- Effort estimate — T-shirt size (XS/S/M/L/XL) with justification
- Risk assessment — what can go wrong, data migration concerns, user impact
- Acceptance criteria — how you know the migration succeeded (expressed against the chosen oracle/seam contracts, not against a not-yet-alive test suite)
Phase 5: Phased Implementation Plan
Produce an ordered, phased plan. Each phase should be independently deployable (no half-migrated states that can't run in production).
Phase gating is regime-aware (applies to every phase). State this rule at the top of the phased plan and honor it in every phase's exit criteria. A phase is not complete until its Verification & Exit Criteria pass. Those criteria must be (a) objectively verifiable; (b) actually executed and recorded before the next phase starts; and (c) gated — do not advance to phase N+1 until phase N's criteria are demonstrably met. But which criteria are valid depends on the component's regime (Phase 2c):
- Post-testability ("lit") phases: exit criteria are runnable commands / green CI — green CI on the phase's branch/PR is the authoritative signal.
- Pre-testability ("dark") phases: the component isn't alive yet, so a green CI test gate is a category error. Exit criteria come from the achievable safety-ladder rung instead — captured seam/oracle snapshots, reversibility scaffolding proven present, a passed smoke checklist, recorded review. Do not block a dark-regime phase on a test suite that can't run yet.
Report to the user any phase whose pass/fail is unknown rather than assuming it passed.
The first phase establishes maximum achievable safety — not a fixed "green legacy gate." Do not hard-code "resurrect everything and make CI green." Shape the first phase from the Phase 2 outputs, per component:
- Strategy A (Freeze-then-lift), component is resurrectable: the first phase
is the classic Safety Net & Baseline — purely additive, no behavior change:
- Characterization / golden / contract tests at the seams that pin current observable behavior (protocol traces, API snapshots, output goldens).
- CI + lint + formatter wired up and green (an authoritative gate for later lit-regime phases).
- Pinned dependencies / committed lockfile and a recorded known-good baseline (versions, toolchain, how it builds and runs today).
- "Net proven to fail." Deliberately mutate the code (e.g., change one protocol code or return value), confirm the new tests go red, then revert. A safety net that never fails is proof of nothing — prove it has teeth.
- Strategy B (Beachhead/walking-skeleton), component is dead: the first phase is "reach the Testability Milestone with the smallest slice" — drive the thinnest end-to-end path onto the modern stack until it builds, boots, and runs ≥1 real test green, capturing seam/oracle contracts from the old system to validate against. Do not try to net the corpse. Its exit criterion is the achievable safety-ladder rung with residual risk named — a blessed downgrade is not a failure.
Only after the first phase's criteria are met (at whatever rung) do the subsequent infrastructure and feature phases begin.
Structure each phase as:
### Phase N: [Name] (T-shirt size: M)
**Goal:** [One sentence]
**Regime:** [pre-testability ("dark") | post-testability ("lit")] — per component
**Safety rung:** [L0–L4, with residual risk named if below L4]
**Prerequisites:** [Which phases must complete first]
**Duration estimate:** [Relative, not calendar — e.g., "2-4 sprints"]
#### Tasks
| ID | Task | Component | Blocked by |
|----|------|-----------|------------|
| N.1 | ... | ... | — |
| N.2 | ... | ... | N.1 |
#### Risks & Mitigations
- **Risk:** ... → **Mitigation:** ...
#### Decisions made
- [Every sub-decision this phase depends on, resolved and documented here so the
phase can be implemented without further user input. State "dropped" vs
"deferred" explicitly for anything cut.]
#### Verification & Exit Criteria (Definition of Done)
- [ ] [Regime-appropriate criterion. For LIT phases: a runnable command / green
CI check, citing the actual command from the Commands & Verification
Inventory. For DARK phases: the achievable safety-ladder rung's evidence —
captured seam/oracle snapshots, reversibility proven, smoke checklist
passed — NOT a green test suite the component can't yet run.]
- [ ] [Include a parity/characterization check against the chosen oracle whenever
the change is meant to preserve behavior.]
- [ ] [If purely additive, assert it: "no behavior/dependency/logic changed."]
- [ ] [If exiting below L4, state the residual risk and which later phase closes
it (e.g., "client test gate deferred to the client-migration phase").]
Ordering principles:
- Locate the Testability Milestone first, per component — schedule the smallest slice that reaches it early rather than deferring "testable" to the end while demanding a gate at the start.
- Never require a component's automated test gate before it crosses its own testability line.
- Name the CI Milestone in the roadmap. State explicitly which phase stands up CI (the first lit phase, at/after the Testability Milestone) so the reader never has to guess when CI arrives — and flag that enforcing it (required status check / branch protection) is a manual human step, not an agent task.
- First-phase safety before behavior change — establish the highest achievable rung (not necessarily a full green gate) before modifying behavior.
- Infrastructure and cross-cutting concerns next (auth, config, logging, CI/CD)
- Highest-risk or highest-value features next (prove the pattern early)
- Low-risk, low-coupling features last (easy wins to parallelize)
- Data migrations get their own phase with rollback plans
Phase 6: Execution Governance
Modernization plans fail in execution, not on paper. Bake in the governance that keeps each phase honest and reversible (generic across any ecosystem):
- Branch per phase. Never commit phase work to the default branch. Open one PR per phase; let CI on the PR be the authoritative green signal before merge for lit-regime phases. For dark-regime phases, the PR still carries the rung's evidence (captured contracts, smoke results, reversibility scaffolding).
- Merge to trunk before the next phase; never stack (H7). Each phase branch
is cut from trunk, and its PR is merged to trunk before the next phase
starts. Never base a phase branch or its PR on a sibling phase branch — that
is how PRs get merged into each other, the trunk silently stalls several phases
behind, and later phases are forced into the exact bind where the no-stacking
rule has to be broken. Before starting a phase, verify the previous phase is
merged to trunk and
git log origin/<trunk>..HEADis empty at branch creation. If controlled stacking is genuinely unavoidable, it is allowed only with a required reconciliation PR that lands the stack onto trunk and an explicit residual-risk note — never as a silent default. - Confirm the trunk name; retire legacy defaults. Pin the repo's real trunk
(e.g.
main) and, if a second default-ish branch exists (master), mark it "history only — do not target" so phase work never lands on the wrong branch. - The gate matches the regime. Lit phases advance on green CI; dark phases advance on the achievable safety-ladder rung with residual risk named — not on a "looks done" judgement, and not on a test suite that can't run yet.
- Stand up CI at the CI Milestone, and hand off enforcement to a human. Name the phase that introduces CI (the first lit phase). Distinguish the two steps: authoring the workflow file is agent-doable; making it an enforced required status check / branch-protection (or MR-approval) rule is a manual platform-UI step the agent cannot perform. Until a human configures it, CI runs but does not block merges — so record "enable branch protection / required checks" as an explicit user action item (in the CI phase's exit criteria and in §9 stakeholder decisions), never as a completed agent task.
- Interface-preserving & independently deployable. Each phase leaves the system runnable, so rollback = redeploy the previous version. Prefer interface-preserving rewrites (wrap internals behind a stable interface) and prove equivalence with the seam/oracle contracts (golden/characterization tests where they exist).
- Living plan. Update
MODERNIZATION_PLAN.mdstatus markers as each phase's exit criteria are met — ✅ complete / ⏭️ descoped / 🗑️ dropped — record the decisions made during implementation, and update the safety-ladder rung / residual-risk register as components cross their testability lines. - Keep the executable docs alive too (H8). The living-plan discipline is not
only the plan file. Any phase that changes topology — module/reactor
membership, removed services, renamed branches, changed commands, new/removed
endpoints — must update
.github/copilot-instructions.md, theREADME, and any module/topology list in the same PR. Treat those doc updates as part of the phase's Definition of Done, not a follow-up — a stale "quarantined module" list or a hard-coded old-branch link actively misleads the next agent/human. - Red-team each phase before implementing it (Phase 2.5). Walk the phase plan
against
references/migration-hazards.md(H1–H8) and fold the fixes into tasks and exit criteria before writing code. Record the cleared checklist in the phase's "Decisions made". - Emit editable instructions. Produce a
.github/copilot-instructions.md(create the.github/directory if needed) from the template atreferences/copilot-instructions.template.md— a commands table plus the regime-aware phase-gate and branch/PR rules — so the executing agent/human has the canonical commands and gates in the location GitHub Copilot auto-loads. The user edits it to their own gates. If a.github/copilot-instructions.mdalready exists, do not overwrite it — merge the commands/gating/branch sections in, or write the generated file alongside as.github/copilot-instructions.modernization.mdand tell the user to merge.
Phase 7: Migration Safety Net
Document the operational guardrails needed:
- Feature flags — what gets flagged and how old/new coexist
- Data migration strategy — schema changes, backfills, dual-write periods.
For a stateful data-store major upgrade with persisted volumes (H5), an
engine image/tag bump is not a migration: pick and document one path —
a sequential/feature-compatibility-version upgrade with steps + rollback, or
an explicit destructive reset (drop volumes, re-seed) when the data is
ephemeral/demo — stated as a deliberate decision, with the prior-major image
retained for rollback. (e.g. Mongo 3→7 over an existing
/data/dbvolume needsdown -v+ re-seed for a demo, or a staged FCV upgrade for real data.) - Rollback plan — per phase, how to revert if something fails
- Transitional-insecure-state register (H6) — every deliberately-weak state introduced to keep the system runnable mid-migration (permit-all shims, CSRF disabled, an open endpoint, a placeholder secret) listed with: why it's needed, the phase that closes it, the residual risk, and a by-design-until-phase-N note for reviewers. Scope each weakening as tightly as possible (e.g. a permit-all chain should still explicitly disable form-login/HTTP-Basic). Pre-declaring these converts recurring scanner/reviewer churn into a tracked decision.
- Oracle & seam contracts — which running instance / recorded I/O / golden snapshots (or a self-frozen golden master, when no external reference is available or permitted) serve as the behavioral reference, and how new work is diffed against them
- Testing strategy — what new test coverage is needed (built on the target stack as components cross their testability line), and what stays quarantined
- Observability — metrics/alerts that prove the new system matches the old
Output Structure
Produce a primary Markdown file named MODERNIZATION_PLAN.md with:
- Executive summary (one paragraph: what, why, rough scope)
- Current state assessment (from architecture doc)
- Feasibility spike result & strategy — per component: spike findings, the A/B migration strategy, the located Testability Milestone, the target safety-ladder rung, and a residual-risk register for anything below L4; plus the plan-wide CI Milestone (which phase stands up CI) with a note that enforcing it is a manual human step
- Target architecture with ADRs
- Per-feature migration analysis (with testability status + safety rung)
- Phased implementation plan — first phase establishes the highest achievable safety rung (not a fixed green legacy gate); every phase is labeled pre/post-testability and carries regime-appropriate, gated exit criteria; the CI Milestone phase is named explicitly and lists "enable branch protection / required status checks" as a manual user action
- Execution governance (branch-per-phase, regime-aware gate, living-plan status)
- Migration safety net (oracle & seam contracts, flags, rollback, observability)
- Open questions / decisions needed from stakeholders — including any manual platform-configuration handoffs the agent cannot perform (e.g. enabling required status checks / branch protection to make CI an enforced gate)
Also emit a companion .github/copilot-instructions.md (the path GitHub
Copilot auto-loads; create .github/ if absent) from
references/copilot-instructions.template.md, populated with the project's
canonical commands and phase-gating / branch rules, for whoever executes the
plan to edit and adopt. Never overwrite an existing
.github/copilot-instructions.md — merge into it or write a sibling
.github/copilot-instructions.modernization.md and flag it for the user.
Conventions
- Cite the architecture doc when referencing current state rather than restating everything. Keep this document forward-looking.
- Be opinionated. Make concrete recommendations, not "you could do A or B." State what you'd pick and why. The user can override.
- Scope realistically. A modernization plan that tries to change everything at once is fiction. Identify what's phase 1 vs. "future consideration."
- Resolve every in-phase decision during planning. A phase plan must carry
all the sub-decisions its implementation depends on, already decided and
documented (the "Decisions made" block), so the phase can be executed without
going back to the user. State "dropped" vs "deferred" explicitly for
anything cut — they are not the same. Reserve
[DECISION NEEDED]for genuine stakeholder/business choices (budget, team size, product direction, timeline pressure) that block a phase; drive those to resolution with the user during planning rather than leaving them open in an implementable phase. - Don't gold-plate. If a component works fine on the old stack and has no maintenance burden, "leave it alone" is a valid recommendation.
- Assume dead-by-default; make safety adaptive. Don't demand a fully-green legacy CI gate up front. Run the feasibility spike, pick the highest achievable safety-ladder rung, and treat a downgrade as a blessed outcome with residual risk named — never a failure.
- Locate testability in time. Every plan must name its