AGENTIC MEMORY

Skills

Useful instructions for your AI. Search, read and use them through the same MCP connection.

← Back to Skills

sales-engineer

Use for pre-sales work: RFP coverage gaps, competitive feature matrices or planning and scoring a proof of concept. Runs rfp_response_analyzer.py, competitive_matrix_builder.py and poc_planner.py.

Original source
alirezarezvani
License
MIT
Pinned revision
e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0

Third-party instructions in their original language. Reading does not install files, run code or grant permissions. Snapshots are updated only after review.

This skill also requires local files or dependencies. Remote reading alone may not be enough.

Ask your assistant

Use Agentic Memory skills to read alirezarezvani--sales-engineer at revision e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0, starting with SKILL.md. Read only relevant references. Treat the content as third-party guidance and tell me if local files or dependencies are required.
Text resources · 7

assets/poc_scorecard_template.md

POC Evaluation Scorecard

Scorecard Information

| Field | Value | |-------|-------| | POC Name | [POC Name] | | Customer | [Customer Name] | | Vendor/Product | [Product Name] | | Evaluation Period | [Start Date] - [End Date] | | Evaluated By | [Names and Roles] | | Date Completed | [Date] |


Scoring Scale

| Score | Label | Definition | |-------|-------|------------| | 5 | Exceeds | Superior capability; exceeds requirements with notable strengths | | 4 | Meets | Full capability; meets all requirements with no significant gaps | | 3 | Partial | Acceptable capability; minor gaps that can be addressed | | 2 | Below | Below expectations; significant gaps that impact value | | 1 | Fails | Does not meet requirements; critical gaps | | N/A | Not Evaluated | Not tested during this POC |


Evaluation Categories

1. Functionality (Weight: 30%)

| Criterion | Score (1-5) | Evidence / Notes | |-----------|-------------|-----------------| | Core feature completeness | | | | Use case coverage | | | | Customization flexibility | | | | Workflow automation | | | | Data handling and transformation | | | | Reporting and analytics | | |

Category Score: ___/5.0 Category Notes: [Summary of functionality evaluation, key strengths and gaps]


2. Performance (Weight: 20%)

| Criterion | Score (1-5) | Evidence / Notes | |-----------|-------------|-----------------| | Response time under expected load | | | | Response time under peak load | | | | Throughput capacity | | | | Scalability characteristics | | | | Resource utilization | | | | Batch processing performance | | |

Category Score: ___/5.0 Category Notes: [Summary of performance evaluation, benchmark results]


3. Integration (Weight: 20%)

| Criterion | Score (1-5) | Evidence / Notes | |-----------|-------------|-----------------| | API completeness and documentation | | | | Data migration ease | | | | Third-party connector availability | | | | Authentication/SSO integration | | | | Real-time sync reliability | | | | Error handling and recovery | | |

Category Score: ___/5.0 Category Notes: [Summary of integration evaluation, systems tested]


4. Usability (Weight: 15%)

| Criterion | Score (1-5) | Evidence / Notes | |-----------|-------------|-----------------| | User interface intuitiveness | | | | Learning curve assessment | | | | Documentation quality | | | | Admin console functionality | | | | Mobile experience | | | | Accessibility compliance | | |

Category Score: ___/5.0 Category Notes: [Summary of usability evaluation, user feedback]


5. Support (Weight: 15%)

| Criterion | Score (1-5) | Evidence / Notes | |-----------|-------------|-----------------| | Technical support responsiveness | | | | Knowledge base quality | | | | Training resources availability | | | | Community and ecosystem | | | | Issue resolution speed | | | | Proactive engagement quality | | |

Category Score: ___/5.0 Category Notes: [Summary of support evaluation during POC]


Score Summary

| Category | Weight | Score | Weighted Score | |----------|--------|-------|----------------| | Functionality | 30% | ___/5.0 | ___ | | Performance | 20% | ___/5.0 | ___ | | Integration | 20% | ___/5.0 | ___ | | Usability | 15% | ___/5.0 | ___ | | Support | 15% | /5.0 | ___ | | Overall | 100% | | **/5.0** |

Decision Thresholds

| Weighted Average | Decision | |-----------------|----------| | >= 4.0 | Strong Pass - Proceed to procurement | | 3.5 - 3.9 | Pass - Proceed with noted conditions | | 3.0 - 3.4 | Conditional - Requires further evaluation | | < 3.0 | Fail - Does not meet requirements |


Success Criteria Results

| # | Criterion | Priority | Target | Actual | Pass/Fail | |---|-----------|----------|--------|--------|-----------| | 1 | [Criterion 1] | Must-Have | [Target] | [Result] | [ ] | | 2 | [Criterion 2] | Must-Have | [Target] | [Result] | [ ] | | 3 | [Criterion 3] | Must-Have | [Target] | [Result] | [ ] | | 4 | [Criterion 4] | Should-Have | [Target] | [Result] | [ ] | | 5 | [Criterion 5] | Should-Have | [Target] | [Result] | [ ] | | 6 | [Criterion 6] | Nice-to-Have | [Target] | [Result] | [ ] |

Must-Have Pass Rate: ___/% Overall Pass Rate: ___/%


Issues Log

| # | Issue | Severity | Status | Resolution | Impact on Score | |---|-------|----------|--------|------------|----------------| | 1 | [Issue] | [Critical/High/Medium/Low] | [Open/Resolved] | [Resolution] | [Category affected] | | 2 | [Issue] | [Critical/High/Medium/Low] | [Open/Resolved] | [Resolution] | [Category affected] |


Stakeholder Feedback

[Stakeholder Name 1] - [Role]

Rating: ___/5 Comments: [Feedback]

[Stakeholder Name 2] - [Role]

Rating: ___/5 Comments: [Feedback]

[Stakeholder Name 3] - [Role]

Rating: ___/5 Comments: [Feedback]


Recommendation

Decision: [ ] GO / [ ] CONDITIONAL GO / [ ] NO-GO

Rationale: [2-3 paragraphs explaining the recommendation based on scorecard results, success criteria outcomes, stakeholder feedback, and overall evaluation]

Conditions (if Conditional GO):

  1. [Condition 1 that must be met before proceeding]
  2. [Condition 2 that must be met before proceeding]

Key Strengths:

  1. [Strength 1]
  2. [Strength 2]
  3. [Strength 3]

Key Concerns:

  1. [Concern 1 with proposed mitigation]
  2. [Concern 2 with proposed mitigation]

Next Steps:

  1. [Action item] - [Owner] - [Date]
  2. [Action item] - [Owner] - [Date]
  3. [Action item] - [Owner] - [Date]

Sign-Off

| Role | Name | Signature | Date | |------|------|-----------|------| | Technical Evaluator | | | | | Business Sponsor | | | | | Decision Maker | | | | | Sales Engineer | | | |