capacity-planner

Use when sizing an ops or support team, building a headcount plan or checking utilization risk. Models queues with Erlang C in capacity_modeler.py, analyzes utilization with utilization_analyzer.py and orders hires with hiring_sequencer.py.

Original source
alirezarezvani
License
MIT
Pinned revision
e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0

Third-party instructions in their original language. Reading does not install files, run code or grant permissions. Snapshots are updated only after review.

This skill also requires local files or dependencies. Remote reading alone may not be enough.

Ask your assistant

Use Agentic Memory skills to read alirezarezvani--capacity-planner at revision e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0, starting with SKILL.md. Read only relevant references. Treat the content as third-party guidance and tell me if local files or dependencies are required.
Text resources · 5

references/capacity_anti_patterns.md

Capacity Planning Anti-Patterns

Every ops leader who has missed a peak season has fallen into one or more of these patterns. The math (queueing-theory-canon.md) and the people factors (ops-workforce-planning-canon.md) make each of these predictably destructive. This reference enumerates the eight most common failure modes with sources and the specific guard each tool implements.

The Anti-Patterns

1. Plan-to-100%-Utilization

The mistake: "We have 10 people billing 40 hours each, so we have 400 hours of capacity. Demand is 380 hours. We're fine."

Why it fails: Erlang-C and Hopp & Spearman's VUT equation both show queue length grows as U/(1-U). At 95% utilization, average wait time is ~19× the service time. At 99%, it's ~99×. Variability turns a "barely-covered" plan into nightly fires.

Source: Donald Reinertsen, Principles of Product Development Flow (2009), Principle 12: "We need to operate at lower levels of utilization."

Tool guard: capacity_modeler.py sizes against 70/80/90% scenarios and flags any sizing point above 85% with a Reinertsen-cited warning.

2. Treat-Ramp-as-Instant

The mistake: "We approved 8 new hires for Q3, so we have +8 FTE of capacity starting Q3."

Why it fails: A new T1 support hire is ~50% productive in weeks 1-8. A new BizOps analyst is closer to ~30% productive in weeks 1-12 because of tool sprawl and tribal knowledge. The "wait, they're not contributing yet" gap is when your team burns out.

Source: Will Larson, Staff Engineer (Stripe Press, 2021); Camille Fournier, The Manager's Path (O'Reilly, 2017).

Tool guard: hiring_sequencer.py applies a productivity factor that linearly ramps 50% → 100% over ramp_time_weeks, and front-loads hires (Q1 35%, Q2 30%, Q3 20%, Q4 15%) so EOY productivity catches the adjusted target.

3. Ignore-Attrition

The mistake: "We have 15 today. We need 35 by EOY. Hire 20."

Why it fails: At 30% annual attrition (BPO-industry midpoint), you will lose 4-5 of the original 15 during the year AND ~3-5 of your new hires before they fully ramp. The real gap is 28-30 hires, not 20.

Source: Bersin / Deloitte talent benchmarks (2015-2023); Edward Lawler, Strategic Workforce Planning (USC CEO, 2008).

Tool guard: hiring_sequencer.py requires attrition_rate_annual_pct and distributes attrition quarterly via compounded probability, adding the expected replacement hires to the gap calculation.

4. Hire-ICs-Forever

The mistake: "We don't need a manager — everyone's an individual contributor reporting to the director."

Why it fails: Fournier's research (and Andy Grove's High Output Management before her) is unambiguous: at 8-10+ direct reports, 1:1s degrade, feedback cycles slip, attrition climbs, and the director becomes the bottleneck. The cost shows up as attrition + ramp re-work, not as a missed SLA.

Source: Camille Fournier, The Manager's Path, ch. 5; Andy Grove, High Output Management (1983), ch. on managerial output.

Tool guard: hiring_sequencer.py triggers a manager hire when projected span of control exceeds 7 ICs per manager, reallocating one quarter's IC slot to a manager hire.

5. Size-to-P50-Demand-Only

The mistake: "Average daily volume is 320 tickets. We can handle that."

Why it fails: Demand is a distribution, not a number. If P50 is 320 and P90 is 480, you will be staffed below SLA 10% of business days. Customers don't care that you hit SLA on average; they remember the day you didn't.

Source: Brad Cleveland, Call Center Management on Fast Forward (4th ed., 2019); A.K. Erlang (1909) on traffic distributions.

Tool guard: capacity_modeler.py requires P50, P90, AND P99 demand inputs and sizes the recommendation to P90 with breach probability reported at all three percentiles.

6. No-Shrinkage-Adjustment

The mistake: "Our agents work 8 hours a day, so 8 hours of capacity per agent."

Why it fails: 30% shrinkage is industry-typical. The 8 hours actually delivers ~5.6 productive hours after breaks, training, 1:1s, sync meetings, ad-hoc interrupts, and the unspoken time spent recovering between high-cognitive-load contacts.

Source: Cleveland, Call Center Management on Fast Forward; Google SRE Workbook (2018) ch. 6 on toil budgets.

Tool guard: capacity_modeler.py requires shrinkage_pct, applies a profile default if not provided (support 30%, BizOps 25%, finance-ops 22%, IT-ops 28%), and outputs loaded FTE (post-shrinkage) distinct from raw FTE (Erlang-C agents).

7. Single-Channel-Model-for-Multi-Channel-Work

The mistake: "Sum Erlang-C of voice + chat + email = total required FTE."

Why it fails: Skill-switching cost. Demand-distribution mismatch (chat is bursty; email queues overnight; voice spikes at 10-11am). Real blended-agent productivity is 15-25% below the simple sum because handoff context-loss is taxed per switch. Gartner research consistently finds this premium.

Source: Gartner Customer Service & Support practice annual benchmarks (2015-2023); Sir J.F.C. Kingman (1961) on G/G/1 queues (variability amplifies wait time).

Tool guard: capacity_modeler.py --profile flag encodes channel-mix realities (support, cx profiles assume blended channels with a higher shrinkage default).

8. No-Surge-Plan-for-P99-Events

The mistake: "We're sized to P90 demand. The P99 day will be bad but it's only 1% of days."

Why it fails: P99 days correlate with the highest-revenue events (product launches, billing-cycle peaks, security incidents, regulatory deadlines). Missing SLA on those days has outsize commercial consequences relative to the calendar share. You need an explicit surge plan: overflow tiering, on-call rotation, contracted BPO overflow capacity, or a documented degradation contract.

Source: Hopp & Spearman, Factory Physics (3rd ed., 2008) on peak-demand staffing; Reinertsen, Principles of Product Development Flow on capacity-margin discipline.

Tool guard: capacity_modeler.py reports P(SLA breach) at P99 in all three utilization scenarios, surfacing whether your 80%-utilization sizing leaves you exposed on peak days.

Additional Anti-Patterns Worth Naming

Beyond the eight, three more deserve mention because they appear in nearly every quarterly planning cycle:

9. Use-Last-Year's-AHT

Average handle time creeps. Product complexity grows. Self-service deflects the easy tickets, leaving harder ones in the queue. Re-baseline AHT every quarter, not annually. (Source: Cleveland.)

10. Conflate-Operational-with-Strategic-Planning

This skill is for the next 12 months. If you are planning for a 3-year automation reshape, you need chro-advisor or a strategic workforce plan, not Erlang-C. (Source: Lawler.)

11. Plan-Without-Demand-Forecast-Confidence-Interval

A single point estimate of "we'll handle 4,000 tickets/month next year" is a fiction. You need a forecast distribution. If sales forecasts a 40% YoY growth, your demand P90 grows faster than your demand P50 (more variance). (Source: Kingman; Hopp-Spearman.)

Christensen-Raynor on Resource Allocation

Clayton Christensen and Michael Raynor's The Innovator's Solution (HBR Press, 2003) makes the meta-point: a company's actual strategy is what it staffs, not what it says. If your capacity plan funds firefighting at 80% and improvement at 20%, your strategy is firefighting regardless of any PowerPoint deck. The capacity plan is where strategy meets payroll. Take it seriously.

Lencioni and Goldratt: The Two Disciplines

Pat Lencioni's The Five Dysfunctions of a Team (2002) and Eli Goldratt's The Goal (1984) bookend the operational reality:

  • Lencioni: trust + healthy conflict are prerequisites for capacity discussions to be honest. Teams that can't have direct conversations about whether someone is overloaded will silently fail the capacity plan.
  • Goldratt: subordinate everything to the bottleneck. If your bottleneck is escalation engineering, don't hire more T1s — you'll just queue more work at the choke point.

These appear in the Forcing-question library of SKILL.md.

McKinsey + MIT Sloan on Queueing-Blind Staffing

McKinsey's Customer Care practice (2018-2023 reports) and MIT Sloan's Service Operations research repeatedly document the gap between "intuitive" staffing (manager judgment, headcount ratios) and queueing-theory staffing. The gap is empirically 15-35%: intuitive plans understaff at peak and overstaff at trough. The fix is not more intuition; it is the math in capacity_modeler.py.

The Closing Discipline

For every capacity plan, ask three questions:

  1. What's the queueing math? (Erlang-C, P90 demand, ≤80% util.)
  2. What's the people reality? (Ramp, attrition, span of control.)
  3. What's the bottleneck? (Capacity-planner sizes around a bottleneck; it does not find it. Use process-mapper first.)

Miss any of these and the plan is fiction.