AGENTIC MEMORY

Skills

Useful instructions for your AI. Search, read and use them through the same MCP connection.

← Back to Skills

agent-protocol

Use when C-suite advisor agents need to call each other or run a multi-role meeting. Defines invocation syntax, loop prevention, isolation and response formats.

Original source
alirezarezvani
License
MIT
Pinned revision
e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0

Third-party instructions in their original language. Reading does not install files, run code or grant permissions. Snapshots are updated only after review.

Ask your assistant

Use Agentic Memory skills to read alirezarezvani--agent-protocol at revision e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0, starting with SKILL.md. Read only relevant references. Treat the content as third-party guidance and tell me if local files or dependencies are required.
Text resources · 2

references/invocation-patterns.md

Invocation Patterns — Inter-Agent Protocol

Common cross-functional patterns, with examples and guidance on when to invoke vs assume.


Pattern 1: Revenue Planning Chain

CRO → CFO → CMO

Used when: setting revenue targets, allocating growth budget, modeling pipeline scenarios.

CRO initiates:
"Planning Q3 revenue targets. Need financial constraints and marketing input."

CRO → [INVOKE:cfo|What's our Q3 revenue target given current runway and burn?]

CFO responds:
[RESPONSE:cfo]
Key finding: To maintain 12-month runway without new raise, Q3 ARR target ≥ $2.4M (+20% QoQ)
Supporting data:
  - Current ARR: $2.0M, burn: $180K/month, runway: 14 months
  - 20% QoQ growth maintains runway; <15% triggers bridge discussion
  - Board expectation communicated as 25% QoQ
Confidence: high
Caveat: Assumes no new hires or major infrastructure spend in Q3.
[/RESPONSE]

CRO → [INVOKE:cmo|Given a $2.4M Q3 ARR target, what pipeline coverage and CAC should we plan for?]
[CHAIN: cro → cfo → cmo]

CMO responds:
[RESPONSE:cmo]
Key finding: Need 3x pipeline ($7.2M) and CAC ≤ $8,400 to hit $2.4M ARR target.
Supporting data:
  - Historical close rate: 33% → 3x coverage required
  - Current CAC: $9,100 → 8% efficiency improvement needed
  - Recommended channel mix: 60% outbound, 30% inbound, 10% partner
Confidence: medium
Caveat: Close rate assumes no sales team changes; any rep turnover drops it to 25%.
[/RESPONSE]

What CRO does with this: Synthesizes CFO constraint (target) + CMO playbook (how to hit it) into a revenue plan. Does not invoke further (depth limit reached).


Pattern 2: Hiring Decision Chain

CHRO → CFO → COO

Used when: headcount planning, role approval, capacity vs budget tradeoffs.

CHRO initiates:
"Engineering wants to hire 3 senior engineers. Need budget clearance and capacity validation."

CHRO → [INVOKE:cfo|Can we afford 3 senior engineers in H2? Fully loaded ~$180K each.]

[RESPONSE:cfo]
Key finding: Budget supports 2 hires now; 3rd is contingent on Q2 ARR closing above $2.1M.
Supporting data:
  - Current H2 headcount budget: $340K remaining
  - 2 hires = $270K fully loaded → $70K buffer
  - 3 hires = $405K → $65K over; triggers board approval
Confidence: high
Caveat: Based on current runway projection — fundraise close changes this completely.
[/RESPONSE]

CHRO → [INVOKE:coo|Do operations support onboarding 2-3 engineers in H2? Any capacity constraints?]
[CHAIN: chro → cfo → coo]

[RESPONSE:coo]
Key finding: Can absorb 2 comfortably; 3rd requires dedicated onboarding lead or delays velocity 6 weeks.
Supporting data:
  - Current eng team: 8 → adding 2 is 25% growth (manageable)
  - Onboarding bottleneck: 1 senior eng mentor per 1-2 new hires, currently at capacity
  - Dev environment setup: 3-week lead time per hire
Confidence: medium
Caveat: Assumes no concurrent product launches requiring full team focus.
[/RESPONSE]

CHRO synthesis: Recommends 2 hires now, pipeline 3rd for Q3 contingent on ARR milestone.

Pattern 3: Product Launch Chain

CPO → CTO → CMO

Used when: planning feature launches, assessing readiness, aligning go-to-market.

CPO initiates:
"Planning Q3 launch of [Feature X]. Need technical readiness and GTM input."

CPO → [INVOKE:cto|Is Feature X technically ready for Q3 launch? Key risks?]

[RESPONSE:cto]
Key finding: 70% complete; Q3 launch is achievable with scope cut — 2 items must move to Q4.
Supporting data:
  - Core feature: complete; performance optimization: 3 weeks remaining
  - Infrastructure scaling: needs load testing at 10x current volume
  - Scope cuts needed: advanced analytics dashboard, third-party integrations
Confidence: medium
Caveat: Assumes no critical bugs found in load testing; historical rate suggests 1-2 found.
[/RESPONSE]

CPO → [INVOKE:cmo|Given Q3 launch of Feature X (core only, no analytics/integrations), what's the GTM plan?]
[CHAIN: cpo → cto → cmo]

[RESPONSE:cmo]
Key finding: Core-only launch works for existing customers; new logo acquisition needs integrations — recommend phased announcement.
Supporting data:
  - Phase 1: Early access for top 20 accounts → testimonials and case studies
  - Phase 2: Full launch with integration partners in Q4
  - CAC impact: core-only launch reduces new logo conversion rate 15%
Confidence: medium
Caveat: Competitor launched similar feature last month — window for differentiation is narrow.
[/RESPONSE]

Pattern 4: Crisis Broadcast

CEO → All Roles

Used when: major adverse event, fundraise miss, key customer loss, market disruption.

CEO broadcasts:
[BROADCAST:all|Scenario: largest customer (28% of ARR) gives 60-day termination notice. 
Each role: what's the immediate impact on your domain and your top recommended action?]

Roles respond INDEPENDENTLY (no agent sees others' responses first):

[RESPONSE:cfo]
Key finding: 28% ARR loss drops runway from 14 to 8 months at current burn.
Supporting data:
  - Lost ARR: ~$560K → burn multiple increases from 1.8x to 3.2x
  - Bridge options: $500K credit line (pre-approved), defer 2 planned hires
  - Fundraise timeline must compress: target term sheet within 60 days
Confidence: high
Caveat: Assumes no secondary customer churn triggered by news.
[/RESPONSE]

[RESPONSE:cro]
Key finding: Pipeline must replace $560K ARR within 6 months to avoid emergency measures.
Supporting data:
  - Current qualified pipeline: $1.8M → need 31% close rate (currently 28%)
  - 3 deals in late stage can cover 70% of gap if closed this quarter
  - Churn risk: 2 other accounts had similar usage patterns — immediate EBR required
Confidence: medium
Caveat: Close rate may drop if word spreads; manage communication carefully.
[/RESPONSE]

[RESPONSE:chro]
Key finding: Hiring freeze recommended immediately; retain all current staff.
Supporting data:
  - 4 open reqs should pause pending CFO guidance
  - At-risk of counter-poaching: 2 senior engineers, 1 product lead
  - Retention bonuses for key staff: ~$80K to secure 12-month commitments
Confidence: high
Caveat: Morale impact of freeze can accelerate attrition if not communicated well.
[/RESPONSE]

[RESPONSE:cpo]
Key finding: Accelerate features that differentiate with remaining accounts; reduce scope to core.
Supporting data:
  - Lost customer's feature requests: deprioritize (no longer strategic)
  - Features most valued by remaining top 5 accounts: [list from account data]
  - Reduce Q3 scope by 30% to free engineering capacity for retention work
Confidence: medium
Caveat: Need sales input on which features are blocking new logo deals.
[/RESPONSE]

[RESPONSE:cmo]
Key finding: Control the narrative; proactive communication to market reduces churn cascade risk.
Supporting data:
  - Draft customer communication within 48 hours (frame as strategic pivot, not loss)
  - Press: no comment strategy unless proactively asked
  - Replace pipeline: double down on ICP segments where we're strongest
Confidence: medium
Caveat: If customer goes public with criticism, narrative control becomes much harder.
[/RESPONSE]

CEO synthesis: [Aggregates all 9 responses, identifies conflicts, sets priorities]

When to Invoke vs When to Assume

Invoke when:

  • Cross-functional data is material to the decision
  • Getting it wrong changes the recommendation significantly
  • The other role has data you genuinely don't have
  • Time allows (not in Phase 2 isolation)

Assume when:

  • You're in Phase 2 (always — no exceptions)
  • The chain is at depth 2 (you cannot invoke further)
  • The answer is directionally obvious (e.g., "CFO will care about runway")
  • The precision doesn't change the recommendation

State assumptions explicitly:

[ASSUMPTION: runway ~12 months — not verified with CFO; actual may vary ±20%]
[ASSUMPTION: CAC ~$8K based on industry benchmark — CMO has actual figures]
[ASSUMPTION: engineering capacity at ~70% — not verified with CTO]

Handling Conflicting Responses

When two agents give incompatible answers, surface it:

[CONFLICT DETECTED]
CFO says: runway extends to 18 months if Q3 targets hit
CRO says: only 45% confidence Q3 targets will be hit
Resolution: use probabilistic blend
  - 45% probability: 18-month runway (optimistic case)
  - 55% probability: 11-month runway (current trajectory)
Expected value: ~14 months
Recommendation: plan for 12 months, trigger bridge at 10.
[/CONFLICT]

Resolution options:

  1. Conservative: Use worse case — appropriate for cash/runway decisions
  2. Probabilistic: Weight by confidence scores — appropriate for planning
  3. Escalate: Flag for human decision — appropriate for high-stakes irreversible choices
  4. Time-box: Gather more data within 48 hours — appropriate when data gap is closeable

Anti-Patterns to Avoid

| Anti-pattern | Problem | Fix | |---|---|---| | Invoke to validate your own conclusion | Confirmation bias loop | Ask open-ended questions | | Invoke when assuming works | Unnecessary latency | State assumption clearly | | Hide conflicts between responses | Bad synthesis | Always surface conflicts | | Invoke across depth > 2 | Loop risk | State assumption at depth 2 | | Invoke during Phase 2 | Groupthink contamination | Flag with [ASSUMPTION:] | | Vague questions | Poor responses | Specific, scoped questions only |