board-meeting

Use for /c-level-agents:boardroom or a strategic question that needs a structured multi-executive deliberation. Runs six phases: context, isolated C-suite views, critic, synthesis, founder review and decision.

Original source
alirezarezvani
License
MIT
Pinned revision
e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0

Third-party instructions in their original language. Reading does not install files, run code or grant permissions. Snapshots are updated only after review.

Ask your assistant

Use Agentic Memory skills to read alirezarezvani--board-meeting at revision e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0, starting with SKILL.md. Read only relevant references. Treat the content as third-party guidance and tell me if local files or dependencies are required.
Text resources · 4

references/meeting-facilitation.md

Meeting Facilitation Guide

Operational playbook for running board meetings using the 6-phase protocol. Reference this when things go sideways — and they will.


Keeping Phase 2 Contributions Focused

The problem: Agents with deep domain knowledge tend to over-contribute. An unconstrained CFO can produce 1,500 words on a single agenda item. This kills the meeting.

The rules:

  • Hard cap: 5 key points per role. If a role produces more than 5, Chief of Staff trims to the 5 most material.
  • Every point must include a recommendation or stance. Observations without positions are filler.
  • No hedging language. "It depends" is not a key point. "We should do X if Y, Z if not Y" is.
  • Confidence rating required. Forces the agent to be honest about what they actually know.
  • "What would change my mind" — this is the most important line in the contribution. It forces falsifiability.

How to enforce:

Chief of Staff instruction to each role:
"You have 5 key points maximum. Each must include a clear stance.
End with your recommendation and what would change your mind.
Do not read other agents' contributions before writing yours."

If a contribution runs long:

  • Trim to the 5 highest-signal points
  • Preserve the recommendation and confidence rating
  • Flag in the raw transcript: "[Trimmed for meeting — full version in raw log]"

Handling Role Conflicts in Phase 3

What the Executive Mentor is for: Not harmony. Not consensus. Productive friction.

Common conflict types:

1. Data conflict (two agents cite contradictory numbers)

  • Flag both numbers explicitly
  • Do NOT pick a winner — that's the founder's job
  • Ask: "CFO says CAC is $2,400. CRO says $1,800. These can't both be right. Which dataset are you using?"
  • Action item: Assign data reconciliation to one owner before next meeting

2. Priority conflict (two agents want different things first)

  • Surface the underlying assumption difference
  • Example: "CMO wants to invest in brand. CFO wants to cut burn. The real question is: do we believe revenue will grow 40% next quarter?"
  • Frame as a bet, not a fight

3. Role conflict (agent operating outside their lane)

  • CFO making product calls → flag and exclude from synthesis
  • CMO commenting on architecture → flag and exclude
  • The Executive Mentor notes: "[ROLE] contribution on [topic] is outside domain. Excluded from synthesis. Refer to [correct role]."
  • This is not an error. It's expected. Executives have opinions on everything. Only domain-relevant contributions count.

4. False consensus (everyone agrees but nobody has evidence)

  • This is the most dangerous failure mode
  • Symptom: All Phase 2 contributions say "yes" with high confidence
  • Executive Mentor response: "Unanimous agreement on a hard question is a red flag. What evidence does each of you have? Or are you reasoning from the same assumption?"
  • Force each agreeing agent to state their independent evidence

When to Extend vs Cut Short a Meeting

Extend when:

  • A genuine new risk surfaces in Phase 3 that wasn't in the agenda
  • The founder asks a question that requires re-running Phase 2 for a new angle
  • A data conflict is discovered that changes the decision space entirely
  • The action items from synthesis are unclear or unowned

How to extend: Add a new mini-Phase 2 with only the relevant roles for the new question. Don't restart the full meeting.

Cut short when:

  • The founder has already reached a decision before Phase 4 — capture it, log it, move on
  • The agenda item is resolved in Phase 2 without genuine conflict — skip Phase 3, go straight to synthesis
  • It's a pure update meeting with no decisions required — skip Phases 2-4, go straight to action items

Never cut short:

  • Phase 5 (founder review) — always required, always explicit
  • Phase 6 (decision extraction) — always required, even for small decisions

Handling Founder Disagreement with All Agents

This happens. The founder has context agents don't.

Protocol:

  1. Acknowledge explicitly: "You're overriding the consensus position."
  2. Ask: "What do you know that the agents didn't factor in?" (Not to challenge — to capture.)
  3. Log the override in Layer 2 with full context:
    User Override: Founder rejected [consensus position] because [reason].
    Decision: [founder's actual decision]
    Agent recommendation: [what they said] — DO NOT RESURFACE without new data
    
  4. Never push back on a founder override. Document it. Move on.
  5. If the same override happens 3+ times, flag a pattern: "You've overridden the CFO on burn rate three meetings in a row. Would you like to update the financial constraints in company-context.md?"

What NOT to do:

  • Don't say "but the CFO said..."
  • Don't re-argue on behalf of any agent
  • Don't note it as a "controversial" decision in the minutes — it's just the decision

Common Failure Modes

Groupthink

Symptom: All agents produce similar recommendations with high confidence. Cause: Agents are inadvertently reading each other's outputs (Phase 2 isolation violated), or company-context.md contains implicit bias toward one direction. Fix: Re-run Phase 2 with explicit isolation. Ask: "Give me the strongest argument AGAINST this direction."

Analysis Paralysis

Symptom: Phase 2 produces comprehensive analysis but no clear recommendation from any role. Cause: Agents are hedging. Usually happens on genuinely hard questions. Fix: Force the issue. "I need a recommendation, not an analysis. If you had to bet the company on one direction, what would it be? Confidence can be Low."

Bikeshedding

Symptom: 30+ minutes spent on a detail that doesn't matter to the core decision. Cause: An easy-to-understand sub-problem attracts disproportionate attention. Example: Debating button color on a pricing page instead of the pricing strategy. Fix: Chief of Staff intervenes: "This is a sub-decision. I'm logging it as a separate action item for async resolution. Back to [main agenda item]."

Scope Creep

Symptom: New agenda items keep appearing mid-meeting. Cause: Meeting surfaces real issues that feel urgent. Fix: New items go on a "parking lot" list. Addressed after the current agenda is complete or in the next meeting.

🅿️ PARKING LOT
- [Item 1] — added by [role], will address [when]
- [Item 2]

Layer Contamination

Symptom: Future meeting references a rejected proposal or a debate that was never approved. Cause: Phase 1 accidentally loaded a raw transcript instead of decisions.md. Fix: Hard rule in Phase 1: load decisions.md (Layer 2) ONLY. Never load raw transcripts. If raw context is needed, founder explicitly requests it.

Decision Amnesia

Symptom: Same question debated again in a later meeting. Cause: Layer 2 decisions.md not consulted in Phase 1, or entry was too vague. Fix: Phase 1 always surfaces relevant past decisions. If a question was already decided, Chief of Staff surfaces it: "We addressed this on [DATE]. Decision was [X]. Do you want to reopen it?"

Role Fatigue

Symptom: Later agents in Phase 2 (CHRO, CRO) produce weaker contributions. Cause: Context window pressure. Agents at the end of a long meeting have less capacity. Fix: For meetings with 7+ roles, split into two batches. First batch: strategic roles (CEO, CFO, CMO). Second batch: operational roles (COO, CHRO, CRO). Run Executive Mentor after all contributions.


Meeting Health Metrics

After each board meeting, score it:

| Metric | Good | Bad | |--------|------|-----| | Action items produced | 3–7 | 0 or >10 | | Decisions with clear owners | 100% | < 80% | | Unresolved open questions | 1–3 | >5 | | Founder overrides | 0–2 | >5 (suggests context mismatch) | | Roles activated | 3–6 | All 9 (too many = noise) | | Phase 2 conflicts surfaced | At least 1 | 0 (groupthink risk) |

Track these in ~/.claude/decisions/meeting-health.md over time. Pattern: if action items consistently exceed 8, meetings are too infrequent. If conflicts are consistently 0, isolation is broken.