AGENTIC MEMORY

Skills

Useful instructions for your AI. Search, read and use them through the same MCP connection.

← Back to Skills

ab-test-setup

Use before planning or launching any A/B, split or multivariate test, or when asked if a result is significant. Sizes the test with sample_size_calculator.py and writes the hypothesis, metric and stop rule first, so it is not called early on noise.

Original source
alirezarezvani
License
MIT
Pinned revision
e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0

Third-party instructions in their original language. Reading does not install files, run code or grant permissions. Snapshots are updated only after review.

This skill also requires local files or dependencies. Remote reading alone may not be enough.

Ask your assistant

Use Agentic Memory skills to read alirezarezvani--ab-test-setup at revision e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0, starting with SKILL.md. Read only relevant references. Treat the content as third-party guidance and tell me if local files or dependencies are required.
Text resources · 3

references/test-templates.md

A/B Test Templates Reference

Templates for planning, documenting, and analyzing experiments.

Test Plan Template

# A/B Test: [Name]

## Overview
- **Owner**: [Name]
- **Test ID**: [ID in testing tool]
- **Page/Feature**: [What's being tested]
- **Planned dates**: [Start] - [End]

## Hypothesis

Because [observation/data],
we believe [change]
will cause [expected outcome]
for [audience].
We'll know this is true when [metrics].

## Test Design

| Element | Details |
|---------|---------|
| Test type | A/B / A/B/n / MVT |
| Duration | X weeks |
| Sample size | X per variant |
| Traffic allocation | 50/50 |
| Tool | [Tool name] |
| Implementation | Client-side / Server-side |

## Variants

### Control (A)
[Screenshot]
- Current experience
- [Key details about current state]

### Variant (B)
[Screenshot or mockup]
- [Specific change #1]
- [Specific change #2]
- Rationale: [Why we think this will win]

## Metrics

### Primary
- **Metric**: [metric name]
- **Definition**: [how it's calculated]
- **Current baseline**: [X%]
- **Minimum detectable effect**: [X%]

### Secondary
- [Metric 1]: [what it tells us]
- [Metric 2]: [what it tells us]
- [Metric 3]: [what it tells us]

### Guardrails
- [Metric that shouldn't get worse]
- [Another safety metric]

## Segment Analysis Plan
- Mobile vs. desktop
- New vs. returning visitors
- Traffic source
- [Other relevant segments]

## Success Criteria
- Winner: [Primary metric improves by X% with 95% confidence]
- Loser: [Primary metric decreases significantly]
- Inconclusive: [What we'll do if no significant result]

## Pre-Launch Checklist
- [ ] Hypothesis documented and reviewed
- [ ] Primary metric defined and trackable
- [ ] Sample size calculated
- [ ] Test duration estimated
- [ ] Variants implemented correctly
- [ ] Tracking verified in all variants
- [ ] QA completed on all variants
- [ ] Stakeholders informed
- [ ] Calendar hold for analysis date

Results Documentation Template

# A/B Test Results: [Name]

## Summary
| Element | Value |
|---------|-------|
| Test ID | [ID] |
| Dates | [Start] - [End] |
| Duration | X days |
| Result | Winner / Loser / Inconclusive |
| Decision | [What we're doing] |

## Hypothesis (Reminder)
[Copy from test plan]

## Results

### Sample Size
| Variant | Target | Actual | % of target |
|---------|--------|--------|-------------|
| Control | X | Y | Z% |
| Variant | X | Y | Z% |

### Primary Metric: [Metric Name]
| Variant | Value | 95% CI | vs. Control |
|---------|-------|--------|-------------|
| Control | X% | [X%, Y%] | — |
| Variant | X% | [X%, Y%] | +X% |

**Statistical significance**: p = X.XX (95% = sig / not sig)
**Practical significance**: [Is this lift meaningful for the business?]

### Secondary Metrics

| Metric | Control | Variant | Change | Significant? |
|--------|---------|---------|--------|--------------|
| [Metric 1] | X | Y | +Z% | Yes/No |
| [Metric 2] | X | Y | +Z% | Yes/No |

### Guardrail Metrics

| Metric | Control | Variant | Change | Concern? |
|--------|---------|---------|--------|----------|
| [Metric 1] | X | Y | +Z% | Yes/No |

### Segment Analysis

**Mobile vs. Desktop**
| Segment | Control | Variant | Lift |
|---------|---------|---------|------|
| Mobile | X% | Y% | +Z% |
| Desktop | X% | Y% | +Z% |

**New vs. Returning**
| Segment | Control | Variant | Lift |
|---------|---------|---------|------|
| New | X% | Y% | +Z% |
| Returning | X% | Y% | +Z% |

## Interpretation

### What happened?
[Explanation of results in plain language]

### Why do we think this happened?
[Analysis and reasoning]

### Caveats
[Any limitations, external factors, or concerns]

## Decision

**Winner**: [Control / Variant]

**Action**: [Implement variant / Keep control / Re-test]

**Timeline**: [When changes will be implemented]

## Learnings

### What we learned
- [Key insight 1]
- [Key insight 2]

### What to test next
- [Follow-up test idea 1]
- [Follow-up test idea 2]

### Impact
- **Projected lift**: [X% improvement in Y metric]
- **Business impact**: [Revenue, conversions, etc.]

Test Repository Entry Template

For tracking all tests in a central location:

| Test ID | Name | Page | Dates | Primary Metric | Result | Lift | Link |
|---------|------|------|-------|----------------|--------|------|------|
| 001 | Hero headline test | Homepage | 1/1-1/15 | CTR | Winner | +12% | [Link] |
| 002 | Pricing table layout | Pricing | 1/10-1/31 | Plan selection | Loser | -5% | [Link] |
| 003 | Signup form fields | Signup | 2/1-2/14 | Completion | Inconclusive | +2% | [Link] |

Quick Test Brief Template

For simple tests that don't need full documentation:

## [Test Name]

**What**: [One sentence description]
**Why**: [One sentence hypothesis]
**Metric**: [Primary metric]
**Duration**: [X weeks]
**Result**: [TBD / Winner / Loser / Inconclusive]
**Learnings**: [Key takeaway]

Stakeholder Update Template

## A/B Test Update: [Name]

**Status**: Running / Complete
**Days remaining**: X (or complete)
**Current sample**: X% of target

### Preliminary observations
[What we're seeing - without making decisions yet]

### Next steps
[What happens next]

### Timeline
- [Date]: Analysis complete
- [Date]: Decision and recommendation
- [Date]: Implementation (if winner)

Experiment Prioritization Scorecard

For deciding which tests to run:

| Factor | Weight | Test A | Test B | Test C | |--------|--------|--------|--------|--------| | Potential impact | 30% | | | | | Confidence in hypothesis | 25% | | | | | Ease of implementation | 20% | | | | | Risk if wrong | 15% | | | | | Strategic alignment | 10% | | | | | Total | | | | |

Scoring: 1-5 (5 = best)


Hypothesis Bank Template

For collecting test ideas:

| ID | Page/Area | Observation | Hypothesis | Potential Impact | Status |
|----|-----------|-------------|------------|------------------|--------|
| H1 | Homepage | Low scroll depth | Shorter hero will increase scroll | High | Testing |
| H2 | Pricing | Users compare plans | Comparison table will help | Medium | Backlog |
| H3 | Signup | Drop-off at email | Social login will increase completion | Medium | Backlog |