AGENTIC MEMORY

Skills

Useful instructions for your AI. Search, read and use them through the same MCP connection.

← Back to Skills

interview-mapper

Use when coding or making sense of one interview transcript (customer, JTBD, expert, usability, exit). Extracts verbatim-grounded nuggets with extract_nuggets.py, verifies quotes with verify_quotes.py and checks conclusions hold across reruns with consensus.py.

Original source
alirezarezvani
License
MIT
Pinned revision
e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0

Third-party instructions in their original language. Reading does not install files, run code or grant permissions. Snapshots are updated only after review.

This skill also requires local files or dependencies. Remote reading alone may not be enough.

Ask your assistant

Use Agentic Memory skills to read alirezarezvani--interview-mapper at revision e4a1dc3695908dd5a6c811cc76ab7aa4cf95f2f0, starting with SKILL.md. Read only relevant references. Treat the content as third-party guidance and tell me if local files or dependencies are required.
Text resources · 63

templates/org-mapping-vmdi.md

Lens: Employee Org-Mapping — VMDI codebook (6 blocks · 40 codes)

When: interview with a VMDI employee following the employee guide. This is a REAL project codebook (museum employees, not a reconstruction). Unit: code. Each code is filled in as quote → What it reveals → Recommendation. Output format per code:

**C3.2 | Incident vs pattern** [category: Incident / Pattern / Not mentioned]
Category: PATTERN
What it reveals: [interpretation — what this code reveals about the system]
_"verbatim quote" (Lxx)_
→ Recommendation: [concrete action; if none — "—"]

Code types: Open-ended text (quote+interpretation), Category (closed choice + quote), List (a set from a reference list + quote). If the topic didn't come up — "Not mentioned". Δ (1–5) — when comparing AI↔Human: 1 full divergence · 3 partial · 5 full match. Calculated per block (see references/rubric.md). System-priority rule (Block 3): the same episode recurring across ≥3 employees from different departments = system priority (in synthesis this is triangulation score_insights --k 3 by role).


BLOCK 1. Professional path and dynamics of the relationship with the museum

Goal: context of presence, deliberateness of the choice, internal eNPS.

  • C1.1 Circumstances of arrival [open-ended] — when/where they came from, what brought them to this museum specifically; a deliberate choice or chance.
  • C1.2 Alternatives at the time of hiring [open-ended] — did they consider other places; why VMDI (subject matter/people/stability/other).
  • C1.3 Expectation/reality gap [open-ended] — what turned out unexpected in the first months (+/−).
  • C1.4 Motivators and demotivators [list+quote] — Motivators: Mission/Colleagues/Professional growth/Stability/Other · Demotivators: Bureaucracy/Salary/Management/Other.
  • C1.5 Internal eNPS [category+quote] — Promoter / Neutral / Detractor / Not mentioned. (unstable cell → council S3)

BLOCK 2. Experience of effective professional work

Goal: the system at its best, reproducibility, bottom-up initiative, cross-department interaction.

  • C2.1 Effective case [open-ended] — the project/task of the year they're proud of; the stages.
  • C2.2 Source of the initiative [category] — Bottom-up / Top-down / Situational / Not mentioned.
  • C2.3 Cross-department interaction [open-ended] — who was involved, how communication was built.
  • C2.4 Speed of decisions and approvals [open-ended] — levels of approval; delays even in the best case = a system signal.
  • C2.5 Hidden risks / fragility [open-ended] — what could have gone wrong but didn't.
  • C2.6 Culture of recognition [category+quote] — Acknowledged by management / By colleagues / By visitors / Not acknowledged / Not mentioned. (unstable → council)
  • C2.7 Reproducibility of the result [category] — Systemic process / Personal enthusiasm / Mixed / Not mentioned.
  • C2.P Role-specific question [open-ended] — depends on the employee's function; verbatim quote.

BLOCK 3. Experience of operational failures and systemic constraints

Goal: a map of systemic failures. Each episode is a point where a process breaks.

  • C3.1 Failure episode [open-ended] — a situation with disproportionate costs.
  • C3.2 Incident vs pattern [category] — Incident / Pattern / Not mentioned.
  • C3.3 Cause attribution [list] — Competence / Process / Resources / Communication / Mixed / Not mentioned.
  • C3.4 Zone of responsibility [open-ended] — who could fix it but doesn't; the "nobody's problem" issue.
  • C3.5 Attempts to fix [open-ended] — were any made, the result, where the "wall" is.
  • C3.6 Loss estimate [open-ended] — time/financial losses.
  • C3.7 Opportunity cost [open-ended] — what they'd do with the freed-up resources.
  • C3.P Role-specific question [open-ended] — positioning/reality gap by function.

BLOCK 4. Internal communications and cascading of strategy

Goal: how strategy reaches employees, information gaps, silos, bottom-up initiative.

  • C4.1 Channels for receiving information [open-ended] — formal and informal.
  • C4.2 Transparency of management [open-ended] — did they learn of a decision after the fact.
  • C4.3 Strategy penetration [category+quote] — Articulates / Partially / Doesn't articulate / Not mentioned.
  • C4.4 Cross-department silos [list] — with whom it works effectively, with whom it's difficult; specific pairs.
  • C4.5 Throughput of bottom-up initiative [category+quote] — Present / Formally present, doesn't work / Absent / Not mentioned.
  • C4.6 Employee agency [open-ended] — specific episodes of influencing decisions.

BLOCK 5. Visitor experience through the lens of professional observation

Goal: employees' observations about visitors — an underrated source; patterns outside surveys.

  • C5.1 Memorable episode [open-ended] — the most recent interaction with a visitor.
  • C5.2 Pattern vs exception [category] — Pattern / Exception / Not mentioned.
  • C5.3 Recurring requests / difficulties [list] — friction points along the visitor's path.
  • C5.4 Audience segmentation [open-ended] — differences in the audience across areas.
  • C5.5 Retention / regular visitors [open-ended] — reason for returning; is it tracked.
  • C5.6 Typical visitor + barriers [open-ended] — who comes; what keeps the rest away (structural vs operational barriers).
  • C5.7 Priority change in the experience [open-ended] — one aspect from entry to exit.

BLOCK 6. Priorities and direction of development

Goal: priorities and anti-priorities from the inside, intangible needs, forecast.

  • C6.1 Metaphor for the mission [open-ended] — an image of the museum in non-official language.
  • C6.2 Anchors — what to preserve [list+quote] — what must not be touched even during reforms.
  • C6.3 Anti-priorities [list+quote] — which practices to abandon (often more valuable than the list of priorities).
  • C6.4 Intangible needs [list] — Authority / Information / Autonomy / Recognition / Other.
  • C6.5 Advice to a new director [open-ended] — the most honest answer of the interview.
  • C6.6 Forecast in 3 years [category+quote] — Optimism / Anxiety / Apathy / Not mentioned. (unstable → council)

Total 40 codes: B1=5, B2=8, B3=8, B4=6, B5=7, B6=6. Role-specific codes (C2.P, C3.P) are adapted to the respondent's function.